A closed workshop at the Solar Quality Summit Europe 2026, co-organised by SolarPower Europe and Intersolar.



<aside> πΏοΈ
Aevy β AI-powered unstructured information management for renewable energy assets
Gautier Moulin β [email protected] | aevy.io
</aside>
<aside> βοΈ
SolarNotions OS β [CΔlin to add description]
CΔlin Sas β [CΔlin to add email] | solarnotions.com
</aside>
Thank you for joining us at SQS Europe 2026. Below you'll find everything we covered β the framework, a self-assessment scorecard, a best-practices cheat sheet, and the standards we referenced. Bookmark this page and come back to it when you're ready to act.
<aside> π
In a 40-minute hands-on workshop, participants worked with realistic solar asset documents β commissioning reports, O&M contracts, SCADA exports, contractor emails β under time pressure. Two teams tackled two different scenarios:
Afterwards, the teams compared outputs. The result was always the same: neither team produced what the next person in the chain actually needed. Critical items were missed, cross-references were overlooked, and the gap between "having documents" and "having operational intelligence" became physically visible on the table.
The workshop then introduced a four-layer framework β Extraction, Structuring + Cross-Referencing, Validation, and Orchestration β as a systematic way to close that gap. Everything below unpacks that framework and gives you tools to assess and improve your own operation.
</aside>
Everything in the workshop maps to four layers. If you remember one thing, remember this chain:
DOCUMENTS β [EXTRACTION] β STRUCTURED DATA β [CROSS-REFERENCING] β [VALIDATION] β INSIGHTS β [ORCHESTRATION] β ACTIONS
β β
βββββββββββββββββββββββββββββββββββββββββ FEEDBACK LOOP ββββββββββββββββββββββββββββββββββββββββββββββ
| Layer | Question | In the exercise | In your real operation |
|---|---|---|---|
| 1 β Extraction | What does this document contain? | You read the fragments and pulled out data (scissors) | Manually typing from PDFs into spreadsheets |
| 2 β Structuring + Cross-Referencing | How does it relate to everything else? | You organised info on the A3 sheet and (hopefully) compared across documents | Normalising reports, linking equipment to warranties and history |
| 3 β Validation | Can we trust this? | Blue post-its β "Does this match the SCADA data?" | Cross-checking contractor data against independent sources |
| 4 β Orchestration | Who does what, by when, tracked where? | Yellow post-its β work orders with owners and deadlines | Auto-generated, assigned, tracked, and closed actions |
The key insight from the exercise: documentation failures don't just create gaps in your own work. They create gaps for the next person in the chain β the operations team that inherits a bad handover, the asset manager who receives an unvalidated report, the buyer who can't verify compliance history.